[ad_1]
In Jammu & Kashmir the construction of a 250-meter viaduct (2-lane) in conjunction with a 395-meter (2-lane) Maroge Tunnel, at an estimated cost of Rs 82 Crores has been successfully completed. This was announced by Nitin Gadkari in a post on X.
Gadkari said this infrastructure is situated along the Ramban to Banihal section of NH-44. This 645-meter segment, as part of the larger project, will not only shorten the travel distance by 200 meters, reducing steep gradients, but also provide an alternative route bypassing the Sita Ram Passi slide area.
This infrastructure will also facilitate the smooth flow of vehicles, bypassing the challenging Margo Area gradients, he added. He said that the creation of such infrastructure in Jammu & Kashmir will contribute to the region’s economic growth and enhance its appeal as a premier tourist destination.
[ad_2]
Source link



