Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the td-cloud-library domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/moderndigitalind/public_html/wp-includes/functions.php on line 6170
MP CM Shivraj Chouhan lays foundation stone for India’s largest pumped storage project at Neemuch, ET Government - Modern Digital India
Friday, June 19, 2026

MP CM Shivraj Chouhan lays foundation stone for India’s largest pumped storage project at Neemuch, ET Government

[ad_1]

<p>Madhya Pradesh Chief Minister Shivraj Singh Chouhan virtually inaugurates India’s largest pumped storage project in Madhya Pradesh on Wednesday. </p>
Madhya Pradesh Chief Minister Shivraj Singh Chouhan virtually inaugurates India’s largest pumped storage project in Madhya Pradesh on Wednesday.

Madhya Pradesh Chief Minister Shivraj Singh Chouhan virtually inaugurated India’s largest pumped storage project in Madhya Pradesh on Wednesday. The project is being developed by Greenko Group, India’s largest energy storage company.

The project, which is located in the Khemla block, Neemuch district, Madhya Pradesh, has a capacity of 1440 megawatt (MW), with storage for 7.5 hours and is now being expanded to 1920 MW with storage of 6 hours to provide a storage of nearly 11 Giga watt hours (GWh) daily.

The overall investment will be Rs 11,500 crore over the next three years and generate 4,800 jobs during construction and 200 jobs after completion of the construction, according to a Greenco press release.

An additional Rs 15 crore will be invested in local community projects to support indirect jobs such as small infrastructure contracts, hiring of vehicles, etc. It will be completed within 30 months as against allocated period of 36 months, the company said.

When completed, the project will be able to integrate more than 7000 MW of renewable capacity. This project is an off stream open loop project as it envisages the construction of new off stream reservoir known as the upper reservoir and the existing Gandhi Sagar Reservoir will be used as lower reservoir. The proposed upper reservoir shall be made by construction of a 5,970-metre-long and a 35-metre-tall Asphalt Face Rockfill Embankment Dam (AFRD).

Anil Kumar Chalamalasetty, Group CEO and Managing Director, Greenko Group, said, “The inauguration marks a milestone in India’s clean energy efforts. It is a moment of great pride for Greenko that we have pioneered to deliver 24/7 dispatchable renewable energy solution, for industrial decarbonization and energy transition. Achieving this is made possible through national-level policy backing and the forward-thinking guidance of the Honourable Chief Minister of Madhya Pradesh, Shri Shivraj Singh Chouhan ji. Greenko is committed to facilitate a comprehensive shift towards carbon-free energy through integrated solutions.”

  • Published On Oct 5, 2023 at 07:53 AM IST

Join the community of 2M+ industry professionals

Subscribe to our newsletter to get latest insights & analysis.

Download ETGovernment App

  • Get Realtime updates
  • Save your favourite articles


Scan to download App


[ad_2]

Source link

Read more

Latest News